Skip to main content
Activity is the record of what happened in your project: what the agent found, what it changed, and when. Use it to check what changed since you last looked.
1

Open Activity

Click Activity in the Agent group of the sidebar. Home shows the latest few items in its Logbook preview.
2

Filter by stage

Click All or one stage: Observe, Detect, Fix, Prevent, Evaluate, Optimize, Govern. The filter keeps the stage buttons pressed so you can see which one is on.
3

Open the item

Each row shows a sentence, its stage, and how long ago it happened. Click Open to jump to the related page, when it has one.
4

Look further back

Click Show older to load earlier items.
A new project says Nothing yet. I’ll list what I do here. A stage with no items says “Nothing in Detect yet.” If the list cannot load, it says so and you can try again.
For a project-wide timeline of deploys, prompt edits and policy changes, use Changes. For who changed what, use the Audit log under Govern.

The logbook

When your project has the logbook turned on, Activity is a numbered logbook. Each entry is one row on a ruled line, newest first, with a sign-off column on the right. Rows are only ever added: nothing on this page edits or deletes an entry.
  • Number. The entry number in the margin (#7). It counts up for the project and never changes.
  • Sentence, result and reason. The sentence says what was done, a second line gives the result, and a Because line appears only when there is a recorded reason. Agent entries are written in the first person (I turned on the loops pack). Entries from people and from the system are plain past tense. The page shows the text as it was recorded.
  • Signer. The agent signs ZA. A person signs their initials, and hovering the initials shows the name. Names and initials are shown only to roles that can read the audit log on a Pro plan or higher; everyone else sees the word team. Entries the system wrote itself carry no signature.
  • Corrections. A correction does not change the entry it corrects. It is a new entry that says Corrects #n, and the corrected entry says Corrected by #n. Click either to jump to the other. The number is a link only when the other entry is on the page; if it is older than what has loaded, or a filter hides it, the number is plain text. Click Show older or clear the filter to bring it into view.
  • Reverse. An entry for a policy apply has a Reverse link that opens that apply in the Policies activity page.

Filters

The count above the list names the filters that are on, for example 3 entries shown (Fix, People), older ones below. Click Show older to load earlier entries. At the end of the list, The logbook starts on Mar 3, 2026. tells you the day of the project’s earliest entry, so you know there is nothing older.

Team approvals

Above the filters, one line reads Approval rate 92% · median review 4 min · 30 days. It is read from the project’s approval requests that people approved or rejected in the last 30 days. A part with nothing to report shows a dash (—), never 0: with no decided request the rate and the review time are both a dash. The demo project reports no figures.
If the logbook cannot be read, or your project does not have it on yet, Activity shows the plain list described above instead: stage, sentence and age, with Open and Show older. Home shows the same choice in its Logbook preview: numbered, signed rows when the logbook answers, otherwise the plain rows.

Next steps

  • Home: the latest activity at a glance
  • Needs you: decisions the agent is waiting on
  • Navigation: how the stages are laid out